6. The melt line installation is ready for long time operation when the same temperature is indicated at all temperature measuring points. After a waiting period of 6-8 hours the melt line can be started up.
7. Having reached the operating temperature, use a torque wrench to tighten all screw bolts to the required torque.
8. 1-2 days after plant commissioning check pipe work system once again completely.
9. tighter all flange connections at inner and outer pipe after a period of 2-3 weeks
10. Keep the operation of the pipe work systems as possible to avoid unnecessary system loads.
11. Caution: for cool down period of the melt line use the same procedure as noted under point 5 in reverse order!
来源:中国机械CAD论坛
- 相关文章
- 没有相关文章
- 评论
- seme:文章内容文章内容文章内容文章内容文章内容文章内容文章内容文章内容文章内容 章内容文章内容文章内容文章内容文章内容
- seme:文章内容文章内容文章内容文章内容文章内容文章内容文章内容文章内容文章内容 章内容文章内容文章内容文章内容文章内容
- 浅谈机械工程专业英语的翻译方法和技巧
2009-5-29 10:54:19 - 1 引言 随着改革开放的不断深入 ,国际间的技术交流合作日趋广泛,这对从事机械工程领域的...
- 熔体管安装工艺英文版
2009-5-28 8:49:21 - Installation, operation and maintenance regulations for double tube melt linesA general installation regulations ...
期刊征稿
- 第四届IEEE生物信息与生…
2009-6-30 19:42:01 - 基本信息 主办单位: 四川大学,IEEE生物医学工程协会(EMBS) 承办单位 开始日期 2010/06/18 结束日期 截稿日期 2009/1...
- 第九届全国光电技术学术…
2009-6-30 19:35:58 - 基本信息主办单位: 中国宇航学会光电技术专业委员会承办单位 开始日期 2009/11/01结束日期 截稿日期 2009...